New complete kitchen, All window screens, Bathtub refinished, Hardwood floors sanded/coat of polyurethane, septic tank inspected/pumped, new interior doors/hardware, new electrical switches/outlets, New Electrical Panel, and 8 inches of insulation blown in attic. New Roof replacement 2013. Hot water tank replaced and Partial PVC plumbing replacement 2018: New Garage Door installed, new storm door, new water saving toilets, new kitchen tile floor. Reply to [email protected]